Jan 18, 2010

Flagstone Path & Drainage Considerations

This work in progress in Elmwood is to create a flagstone path walkway around the house leading to an existing patio in the back.


Here you can see that a small retaining wall was added to support the higher grade of existing trees and shrubs.

The path and soil grade against the house had to be lowered in order to avoid soil build up directly on the house.



Additional retaining stones were added on the lower side of the path to help prevent erosion.

Because drainage is a known issue at this location, we want to prevent any seepage against the house. We added 4 inches of drainage rock beneath the walkway, set the stones in sand (as opposed to decomposed granite) to further enable quick drainage from heavy rains and potential run off from the slope of the established planting area and channeled downspout drains away from the house.



The completed landscape will have plantings to complement the house, existing plants and small space on either side of the path.
Check back later to see an update to this project.

1 comment:

  1. Good Drainage system.

    The Trendy feed is one of India’s New business news publications – 60% of Trendyfeed readers do not read another business paper, making Feed a critical reach vehicle for the top end audience. Feed among business papers in terms of readership.

    The Trendy Feed is your daily and a regular dose of all the news, gossips, and entertainment. It is an online platform that tells you what News You Should Know. We provide all the latest news about :

    उसैन बोल्ट ने जमैका में जन्मदिन मनाने के बाद COVID-19 पॉजिटिव पाए गए
    or
    भारत सरकार ने लिया बड़ा फैसला, pubg समेत चीन के 118 ऐप्स को किया बैन

    Visit Our website: The TrendyFeed

    For more information feel free to Contact Us
    Email us: - thetrendyfeed@gmail.com or Contact@thetrendyfeed.com

    ReplyDelete

Website design and website development by Confluent Forms LLC, Easthampton MA